AEROX AHP LEP system was successfully applied on the ORE Catapult’s Levenmouth wind turbine in May 2019 as part of the demonstration activities of the project. The turbine, which is located in the South-East coast of Scotland, has a 171.2 m diameter rotor and the tip speed of the blade is 342 km/h.